Quick links :
Home Page :
Contact Us :
Index :
Site Map :
Search Site :
Tech Info :
Documentation
MPC Status Page: Archive (2003 July)
This page describes enhancements to or problems that have occurred with the MPC's webpages
and scripts and the fixes that have been made.
Recent problems are listed elsewhere.
Index of other older problems..
Older Enhancements and Resolved Problems
Modification to ACKing procedure
2003 July 31: 15:43. The procedure that sends out the acknowledgements has been
modified to include a "junk" rating (the percentage of the submitted message
that does not consist of observations or observational/e-mail header
material). Low "junk" ratings are good, high "junk" ratings are bad.
Please pay attention to your ACK messages!
Possible local network disruption
2003 July 23: 19:18. We have been informed that the Computation Facility intends
to upgrade its LAN routers on Saturday July 26 between 7:00 a.m. and 9:00
a.m. All traffic will be rerouted to the backup router. No interruptions
are anticipated but there may be brief periods of instability.
E-mail disruption
2003 July 11: 09:36. We have been informed that the Computation Facility intends
to replace the current cfa.harvard.edu computer at 7:45 a.m. on July 16.
The downtime will be approximately 30-60 minutes. SMTP connections will
fail during this period, but mail should queue up on the sending computer
and they should be sent when the new machine is brought on-line.
SCULLY downtime
2003 July 10: 16:15. The troublesome fan on SCULLY is getting worse. We have
called for service to replace the fan. The downtime will be as short
as possible and will probably occur in the late morning of July 11.
- The shutdown occurred at 10:55.
- The system was restarted at 11:25.
SCULLY downtime
2003 July 8: 12:40. We had to take the webserver down at short notice to
localize a worrying noise, fearing that a disk drive might be failing.
It turns out that one of the fans is the problem.
- Normal operation was restored at 12:50.
Web Defacement Contest disruption?
2003 July 6: 13:00. It appears that the recently-announced web defacement contest
has started. Network traffic appears to be substantially impacted.
The CF webserver appears not be responding, but the MPC mirror pages
on SCULLY are active and responding (albeit slowly) to user requests.
- 16:53. Internal access to the CF webserver has been restored.
- 17:21. We are informed that the CF lost NIS earlier today and this
affected CF-based web services. They have not given us the reasons
for this loss of NIS.
Accessing Comets with Minor-Planet Designations
2003 July 4: 21:40. A user reported that requesting an ephemeris for 2003 KV2
returned a stack dump. This object was originally designated as a
minor planet but is now P/2003 KV2. The options are to simply return
a meaningful error message indicating that the minor planet designation
has been deleted, indicate that the object is now comet such-and-such,
or quietly change the minor-planet designation into a comet designation
and continue.
- Updated code was put on-line at 23:30 (it would have been earlier
but the Boston fireworks needed watching...) that removes the stack-dump
problem and transparently converts the designation into the appropriate
cometary designation.
Index to the CBAT/MPC/ICQ pages.
Credits
MPC homepage