UVCS MISSION LOG ---------------- Date: 09 Dec 1995 ----- GSFC Time: 23:59 ---------- File Name: 95.12.09.a.log ---------- Compiled by: E. Dennis ------------ UVCS Activity: Adjust Heaters -------------- SOHO Activity: -------------- EOF Staff: A. Ciaravella ---------- M.Romoli The only activity for UVCS was to adjust the setpoints of the EC1 and EC2 heaters. The adjustment recommended by M. Coyle and M. Melton was to change the setpoints from the default value of 128, corresponding to a heater duty cycle of 60%, to a value which would give a duty cycle of 40%. The desired setpoint was estimated to be 150. An NRT session was established and the setpoints changed to this value. The predicted equilibrium temperatures for THEC1 and THEC2 are about 36 C. Other planned UVCS activity, i.e. XDL exposures using the stim pulse, were not performed due to delays in the overall spacecraft schedule for the day, leaving us insufficient time.