• The golden boxes.
  • The empty cold plate.
  • One row done!
  • All the connectors installed on the first row.
  • Joe Zajac operating on the patient.
  • CCD ready to be hoisted into place.
  • Up it goes...
  • Higher...
  • It's in!.
  • Tightening the nuts.
  • The CCD pins (with shorting pad still installed).
  • All the connectors installed.
  • And the final radiation shield.
  • Done!
  • So much silicon.
  • Installing the window.
  • Hoisting the whole center assembly.