cd $MIR ; cvs -nq update ; cvs update
uvedit vis=xxx.mir apfile=antpos.YYMMDD out=yyy.mir
axcor vis=yyy.miriad axoff=@axoff.xxx out=zzz.miriad
configuration | solution | Start/End | status | Notes |
---|---|---|---|---|
A | antpos.sza.101124 | Nov 24, 2010 | First PACS track in A array | C16 used as reference antenna (tried using C20, but failed to give good solutions), C17 out of the array. The changes to the initial solution are in the range 0.4 -- 3.0 cms (as reported by uvedit in miriad). The new solutions have significantly improved the data (see before and after plots). |
A | antpos.101124 | Nov 24, 2010 | First A track | C8 reference antenna; The new solutions have significantly improved the data (see before and after plots), but are still preliminary for few antennas (C7 for e.g.) and needs to be refined with a new track. An xy only fit for a single target (wierdly) failed, and these solutions were based on iterations of phase slope and phase difference between LSB and USB on all sources. |
C | antpos.sza.101112 | Nov 12, 2010 | Final track | C20 used as reference antenna, C17 out of the array. No significant changes from previous solutions as seen here. |
C | antpos.101112 | Nov 12, 2010 | Final track | C8 reference antenna; C9 and C11 changed by ~+0.4mm in "x" offsets relative to Oct 09 solutions as seen here. |
C | antpos.sza.101009 | Oct 09, 2010 | second track? | C20 used as reference antenna, improved solutions for all. |
C | antpos.101009 | Oct 09, 2010 | Second track | C8 used as reference antenna; ~ 5 hours of good weather data; improved the initial solutions with only C5 showing >0.6 mm offsets from previous position. |
C | antpos.100922 | Sep 22, 2010 | First C track | C8 used as reference antenna; satisfactory initial solutions for all antennas based on phase difference followed by 4-parameter fit method; solutions can be improved later on based on a better weather track. |
D | antpos.100919 | Sep 19, 2010 | Final baseline track | C8 used as reference antenna. The previous solutions were not updated into the system. Changes from Aug 1 solutions however are < 0.4mm. |
D | antpos.100906 | Sep 6, 2010 | Third baseline track | C8 used as reference antenna. C10 data is noisy. Changes to antenna positions is < 0.4mm as seen here. |
D | antpos.100803 | Aug 3, 2010 | Second baseline track | C8 used as reference antenna. Track taken after setting the (large) delay offsets. Baseline solutions have been significantly improved. |
D | antpos.100801 | Aug 1, 2010 | First track (for which solutions have been derived) | C8 used as reference antenna. Initial solutions for all antennas. Solutions for C3, C5 and C10 are significantly off (> 7 cms) from the initial offsets. |
SH | antpos.Sci2.100728 | July 28, 2010 | Final SH-config | Best(?) baseline solution after switch to DSS. |
E | antpos.100727 | July 27, 2010 | Final track | C9 used as reference antenna. No significant changes from the previous solution. |
E | antpos.100708 | July 8, 2010 | Second track | C9 used as reference antenna. These are the first solutions for C6 (and moved by ~ 2.3 cms). The solutions have been improved for all other antennas, particularly those that were significantly off from the initial pad offsets. |
E | antpos.100702 | July 2, 2010 | First E-array baseline track | C9 used as reference antenna. No data for C6. Solutions for C1 and C5 have been derived from an earlier very short baseline track and needs improvement. Good solutions for the rest of the array. The initial pad offsets off by ~ 4--6 cms for three antennas. |
hybrid | antpos.100609 | June 9, 2010 | Third baseline track | C1 used as reference antenna. C10 baseline problem has been tracked down to a pointing issue. These are the first good solutions for C10. The initial pad offsets for C10 were off by ~ 7 cms!! |
hybrid | antpos.100606 | June 6, 2010 | Second baseline track | C1 used as reference antenna. Flagged out some bad C17 & C22 data (issues with tertiary). These are the first solutions for C7. Refined solutions for all others except C10, which still has significant errors. |
hybrid | antpos.100604 | June 4, 2010 | first fit for cm run | fit C1,C6,C8,C10,C13,C16-23 vs C14; C14 and all other antennas copied from antpos.100501; C7 not locked; C10 highly questionable; phase jump on C18 |
D | antpos.100530 | May 30, 2010; Final D-array track. | D-config | C8 used as reference antenna. No significant changes from previous solution (< 0.4mm). |
D | antpos.100501 | May 1, 2010; Second D-array baseline track. | D-config | C8 used as reference antenna. Users with 2010 D-array data starting from 1 May until the next baseline update SHOULD use this solution. |
D | antpos.100413 | April 13, 2010; First D-array baseline track. | D-config | C8 used as reference antenna. After flagging the first half of the track with noisy data, the initial solutions were derived using phase-slope method and the 4-parameter fit in bee. Please note that the initial solutions were in error by ~ lambdas!!! Therefore, it is important that PIs who have data taken in D-array before 01 May 2010 use this solution. |
C | antpos.100402 | April 02, 2010; Final C-array track. | C-config | C11 used as reference antenna. The corrections to all antenna positions except C4 and C6 are small as shown here . C4 and C6 solutions have improved the data. |
C | antpos.100314 | Mar 14, 2010; Second C-array track. | C-config | C11 used as reference antenna. The first half of the data was taken under 200 -350 mu rms and the phase scatter is > 0.5 radian. The corrections to all antenna positions are small as shown here . |
C | antpos.100301 | Mar 01, 2010; First C-array track. | C-config | C11 used as reference antenna. I used the slope method to get initial baseline solutions, which was then refined by applying to the raw data and re-deriving baseline solutions in bee (see before and after plots). The corrections to all antenna positions are significant (few cms!) as shown here . |
A | antpos.100214 | Feb 14, 2010; Third (and probably final) A-array track. | A-config | C13 used as refant. Given that C4 was not in the array for the last baseline track, these are the first solutions for C4 (see before and after plots). |
A | antpos.10015 | Jan 15, 2010; Second A-array track on the same night. | A-config | Very good weather conditions through out the track. C13 used as refant. C4 not in the array (see before and after plots). As shown in the plots, these baseline solutions have significantly improved the data. |
A | antpos.100114 | Jan 14, 2010; First A-array track | A-config | Good weather conditions during the track. C13 used as refant. C4 not in the array (see before and after plots) |
B | antpos.100105 | Jan 5, 2010 -- end of B-array | B-config | Good weather conditions during the track. C1 used as refant. C2, C3, C4, C5, C8 seem to have drifted by more than 0.4 mm compared to Dec 10, 2009 solutions (see comparison plot). |
B | antpos.091210 | Dec 10,2009 | B-config | C1 used as refant. C8 has significantly drifted compared to Dec 4, 2009 solutions (see comparison plot). |
B | antpos.sza.100105 | Jan 5, 2010 | SZA solutions derived by Vernesa | Good weather conditions during the track. C17 used as refant. |
B | antpos.091204 | Dec 4, 2009 -- Jan 5, 2010 | second B-config solution w/ all antennas | Obtained good solutions for all antennas. Baseline solutions for Dec03 vs Dec04 is shown here. Phase vs time plots before and after the solutions have been applied. |
B | antpos.091203 | Dec 3, 2009 -- start of B-configuration | first B-config solution w/ all antennas | Good enough to start science tracks, but I am still not satisfied with their accuracy (there is a lot of phase scatter in the fits; up to 0.9 radians, compared to 0.2-0.4 for good solutions; formal accuracy is better than 0.15mm). |
SL | antpos.sza.091129 | Nov 29, 2009 -- end of SL-configuration | final SL-config solution | Seven hours of data. Run in PACS mode, so CARMA and SZA antennas were observing the same sources at the same times. SZA solutions were derived using MIRIAD's bee task. From Vernesa: "It's incredible how samll the phase scatter is in the fits (<0.1rad)." |
C | antpos.091129 | Nov 29, 2009 -- end of C-configuration | final C-config solution | Seven hours of data. Run in PACS mode, so CARMA and SZA antennas were observing the same sources at the same times. There is > 0.4mm difference in the x position values for C8 and C9 as shown here. |
C | antpos.091025 | Oct 25, 2009 -- start of configuration | first proper C-config solution | Solutions derived for all antennas. |
C | antpos.091010 | Oct 10, 2009 -- start of configuration | first C-config solution | C3 behaved the worst (and we need to refine its solutions). C6, C11 were out, and C8 was used as refant. The solutions are good to start science tracks, but we need another track as soon as possible to refine the solutions. |
D | antpos.090903 | Sep 03, 2009 -- end of configuration | third D-config solution | C8 used as refant. No major change compared to previous solutions; see here. |
D | antpos.090808 | Aug 08, 2009 -- Sep 03, 2009 | second D-config solution | C12 used as refant; good solutions. Formal uncertainty is better than 0.15 mm; average scatter of the 4-parameter fits is about 0.2 rad. Phase vs. time plots before and after the solutions have been applied. Positions, compared to previous solutions, are here. |
D | antpos.090723 | July 23, 2009 -- Aug 08, 2009 | first D-config solution | C12 used as refant; good solutions. Formal uncertainty is better than 0.22 mm; average scatter of the 4-parameter fits is about 0.2-0.3 rad. Phase vs. time plots before and after the solutions have been applied. |
E | antpos.090713 | July 13, 2009 -- July 23, 2009 | E-config solution | C3 out of the array, C8 used as refant. C1, C2, and C4 have moved slightly more than 0.4mm compared to previous slolution in y, z, and x/z, respectively. C6 has significantly moved (~0.9mm in x; see comparisson plot) likely due to change of azimuth thrust rollers on this antenna. Phase vs. time plots before and after the solutions have been applied. |
E | antpos.090613 | June 13, 2009 -- July 13, 2009 | E-config solution | Data reduced while in Japan! First E-config solution including C2. |
C | antpos.090414 | Apr. 14, 2009 -- June 6, 2009 | C-config solution | refant=C8. Vernesa used an iterative process: "First the slope-500MHz method reaches a ~6cm accuracy. Then taking the upper/lower sidebands separately yields a ~0.5 cm accuracy. Finally applying these solutions to the initial data set resulted in the attached positions." Here are phase vs. time plots before and after the solutions have been applied. "The formal uncertainties on the (x,y,z) positions are better than 0.1mm. However, the phase scatter of the fit is larger than in optimal conditions [mean~0.4 radian (usually 0.2-0.3), reaching up to >0.6rad for C1, C2, C4], so another track would be useful." |
D | antpos.090331 | Mar. 31, 2009 -- Apr. 9, 2009 | D-config solution | C8 used as refant. C1,2,4,5,6 moved in y more than 0.4mm (see comparison with previous solutions here) Phase vs. time after baseline correction is applied can be found in PhaseTime.BS.090331.pdf |
D | antpos.090225 | Feb. 25, 2009 -- Mar. 31, 2009 | D-config solution | Good solution for C3. Phase vs. time after baseline correction is applied can be found in (PhaseTime.BS.090225.pdf) |
D | antpos.090221 | Feb. 21, 2009 -- Feb. 25, 2009 | First D-config solution | C3 still on A-config pad. Solution derived by Dick Plambeck. |
A | antpos.090131 | Jan. 31, 2009 -- ... | Improved A-array solutions | C2 used as refant. Accuracy within ~1mm, compared to antpos.090127 (compare.090131.pdf). Phase vs. time after baseline correction is shown in (PhaseTime.BS.090131.pdf). |
A | antpos.090127 | Jan. 05, 2009 -- Jan. 31, 2009 | First PROPER A-array solution | Solutions consistent with those below for C1-9, 11, 12, 14, 15. Significant improvement for C10 & C13. |
A | antpos.090119 | see above | First A-array solution | C2 used as reference antenna. Solutions good to ~1mm, or better. C10/10 tricky. Phase rms scatter can be seen here (refant excluded). Phase vs. time after baseline corrections have been applied can be found here (13MB). For reference, a phase. vs. time plot before baseline solution correction were applied can be found here (13MB). |
B | antpos.081221 | Dec. 21 2008 -- Jan. 04 2009 | Second B-array solution | C13 used as reference antenna. C5 has moved >0.4mm. Changes compared to antpos.081121 can be seen here |
B | antpos.081122 | Nov. 21 2008 -- Dec. 21, 2008 | Initial B-array solution | C13 (only antenna that has not been moved) used as reference antenna. |
C | antpos.081024 | Oct. 24 2008 -- Nov. 21 2008 | Second C-array solution | C8 used as reference antenna. First solution for C4; some antennas have moved >0.4mm. Changes compared to antpos.081012 can be seen here |
C | antpos.081012 | Oct. 11 2008 -- Oct. 24 2008 | First C-array solution (based on 2 baseline tracks) | C1, C4 out; C8 used as reference antenna. New solutions will be derived in ~2 weeks. |
E | antpos.081008 | Oct. 08 2008 -- end of E-array | Second E-array solution | All antennas present; C10 used as reference antenna. These solutions confirm the previous E-array solutions; no major changes. The x,y,z position changes, compared to previous solutions (antpos.080912), can be seen here |
E | antpos.080912 | Sep. 12 2008 -- Oct. 08 2008 | Use for E-array tracks; > Sep/12/2008 | |
D | antpos.080827 | Aug. 27 2008 -- Sep. 12 2008 | No major (>0.4mm) changes compared to Jul. 23 solutions. Use for tracks run after Aug/26/2008 | C3 was out of the array, C13 did not lock, refant=C11. Maximum position change (compared to antpos.080723) is 0.3 mm (C12), median position change of all antennas is ~0.03 mm with a 1 sigma spread of 0.1 mm. |
D | antpos.080723 | Jul. 23 2008 -- Aug. 26 2008 | No major changes compared to Jun. 06 solutions. Use for tracks run after July/22/2008 | |
D | antpos.080606 | Jun. 06, 2008 -- Jul. 22 2008 | Final for the move to D-array; use for tracks run after June/05/2008 | |
C | antpos.080518 | May. 18 -- Jun. 05, 2008 | Final | |
C | antpos.080414 | Apr. 14 -- May. 17, 2008 | Final | |
D | antpos.080313 | Mar. 9 -- Apr. 13, 2008 | C1 moved a bit. | |
D | antpos.080228 | Feb. 22, 2008- Mar. 8, 2008 | Final | Good solution after move |
B | antpos.080218 | Feb. 1, 2008-Feb. 17, 2008 | Final | |
B | antpos.080115 | Jan. 5, 2008-Feb. 1, 2008 | Final | Pads moved after snow (Jan.4-5). |
B | antpos.071121 | Nov. 15, 2007- Jan. 5, 2008 | Final | |
C | antpos.071109 | Oct. 26, 2007-Nov. 12, 2007 | Final | Good solution with error ~0.2mm. |
C | antpos.071014 | Oct. 07, 2007-Oct. 25, 2007 | Final | Small changes from previous solution. C1&6 have largest errors. |
C | antpos.070916 | Sep. 08, 2007-Oct. 07, 2007 | Final | Solution after move |
E | antpos.070908 | Aug. 25, 2007-Sep. 11, 2007 | Final | C5,10,12,13,14,15 moved by 0.2-0.3mm from previous sol. |
E | antpos.070808 | Aug. 9, 2007-Aug. 24, 2007 | Final | Good solution after move |
D | antpos.070625 | Jun. 25, 2007-Aug. 9, 2007 | Final | |
D | antpos.070613 | Jun. 13 (noon), 2007-Jun. 25, 2007 | Final | C8 moved slightly (~0.3mm) |
D | antpos.070509 | Apr. 30 (noon), 2007-Jun. 13 (noon), 2007 | Final | |
D | antpos.070411 | Apr. 9 (noon), 2007-Apr. 30 (noon), 2007 | Final | C4,11 moved |
C->D | antpos.070406 | Apr. 6-9 (noon), 2007 | Final | C1,2,5,15 moved |
C->D | antpos.070405 | Apr. 5-6 (noon), 2007 | Final | C7,8,13,14 moved |
C | antpos.070322 | Mar. 5- Apr. 5, 2007 | Final | Good solution |
C | antpos.070220 | Feb. 15, 2007 - Mar. 5, 2007 | Final | antpos.070115 is still ok, but C11 shifted slightly |
C | antpos.070115 | Jan. 9, 2007 - Feb. 15, 2007 | Final | C2, 4, 5 moved |
ENG->C | antpos.070108 | Jan. 8-9, 2007 | Final | C14 moved |
ENG->C | antpos.070105 | Jan. 5-8, 2007 | Final | C15 moved |
ENG->C | antpos.070104 axoff.comb.060914.minus axoff.comb.070101 | Jan. 4-5, 2007 | Final | C8, 11 moved Apply both axoff.comb.060914.minus and axoff.comb.070101 |
ENG->C | antpos.070103 axoff.comb.060914.minus axoff.comb.070101 | Jan. 3-4, 2007 | Final | C7 moved Apply both axoff.comb.060914.minus and axoff.comb.070101 |
ENG | antpos.061220 axoff.comb.060914.minus axoff.comb.070101 | Dec. 20, 2006 - Jan. 3, 2007 | Final | C1 moved Remove C5 for Dec. 12-25 Apply both axoff.comb.060914.minus and axoff.comb.070101 |
ENG |
antpos.061012 axoff.comb.060914.minus axoff.comb.070101 |
Nov. 11, 2006 - Dec. 20, 2006 | Final | Remove C5 for Dec. 12-25 Apply both axoff.comb.060914.minus and axoff.comb.070101 |
ENG |
antpos.061012 axoff.comb.070101 |
- Nov. 10, 2006 | Final |